Ongoing Activity
- Sidewalk closures around the construction site continue to be in effect
- The lagging installation for the shoring ongoing
- Shoring tie-back installation ongoing
- Trucking material offsite ongoing
- Line drilling around the perimeter of the siteĀ is ongoing
- Drilling and blasting rock ongoing
- Drilling and installation of rock anchorsĀ has started