Ongoing Activity

  • Sidewalk closures around the construction site continue to be in effect.
  • Drilling for shoring installation (within the site perimeter) is ongoing.
  • The lagging installation for the shoring ongoing
  • Shoring tie-back installation ongoing
  • Trucking material offsite ongoing

Upcoming Activity

  • Drilling for blasting to begin next week