Ongoing Activity
- Sidewalk closures around the construction site continue to be in effect.
- Drilling for shoring installation (within the site perimeter) is ongoing.
- The lagging installation for the shoring ongoing
- Shoring tie-back installation ongoing
- Trucking material offsite ongoing
- Drilling and blasting rock ongoing
- Line drilling around the perimeter of the site to begin this week