Ongoing Activity
- Sidewalk closures around the construction site continue to be in effect.
- Drilling for shoring installation (within the site perimeter) is ongoing.
- The lagging installation for the shoring ongoing
- Shoring tie-back installation ongoing
- Trucking material offsite ongoing
- Drilling and blasting rock to begin this week
Upcoming Activity
- Line drilling around the perimeter of the site to begin late next week