Ongoing Activity

  • Sidewalk closures around the construction site continue to be in effect.
  • Drilling for shoring installation (within the site perimeter) is ongoing.
  • The lagging installation for the shoring ongoing
  • Shoring tie-back installation ongoing
  • Trucking material offsite ongoing
  • Drilling and blasting rock to begin this week

Upcoming Activity

  • Line drilling around the perimeter of the site to begin late next week