Ongoing Activity

  • Sidewalk closures around the construction site continue to be in effect.
  • Drilling for shoring installation (within the site perimeter) is ongoing.
  • The lagging installation for the shoring ongoing
  • Shoring tie-back installation underway, to continue through the New Year
  • Trucking material offsite ongoing, to continue until Christmas.